Reference list of completed works
«M TECHNOLOGY» LCC
2023
№ | Facilities | Name of work |
---|---|---|
1 | «RTF ACTICA» LLP Pavlodar, Kazakhstan. | Process design of the flue gas afterburning chamber after retort vessels. |
2 | «Kazphosphate» LLP Taraz, Kazakhstan. | Overhaul of the electric ore-thermal furnace “РКЗ-80Ф №8”. |
3 | JSC «Uzmetkombinat”, Bekobod, Uzbekistan. | Construction of a Integrated casting and rolling facility. Execution of HVAC design as well as that of the project civil parts. |
4 | PJSC «ArcelorMittal Kryvyi Rih», Kryvyi Rih, Ukraine. | Long product rolling mill №1. Small section mill 250-3. Switch-over of a continuous heating furnace to a 100х100mm billet production. |
5 | Military unit. Lviv region. | New construction of 3 solid fuel boiler houses with a capacity of 200 kW, 250 kW, 450 kW. For each of the 3 boiler houses, the following works were performed: a survey of existing structures, detailed design development, getting expert’s assessment. |
6 | TOO «NDFZ» Taraz, Kazakhstan. | Development of a process flow diagram for production of phosphorus, including the entire production process. 3D scanning of the actual state of the furnace shop with the subsequent creation of a 3D model. |
7 | TPP AO «SSGPO» Kostanay Region, Rudnyi Kazakhstan. | Start-up complexes No.3 Reconstruction with replacement of the steam generating unit of station No.1 and installation of new gas cleaning equipment. Construction of a new compressed air station |
8 | TOO “VR Management” Almaty, Kazakhstan. | Combined audit of the yellow phosphorus production at NDFZ. |
2022
№ | Facilities | Name of work |
---|---|---|
1 | PJSC «SevGok», Kryvyi Rih | Thickening of the enrichment tailings. Design. Working documentation. |
2 | PJSC «ArcelorMittal», Kryvyi Rih | New construction of mixed gas pipelines and gas booster stations No. 1 and No. 2 of a combined gas and power shop. |
3 | PJSC “KAMET-STAL”, Kamianske | Revamping of the cooling system of BF-9 hot blast stoves with conversion to evaporative cooling. |
2021
№ | Facilities | Name of work |
---|---|---|
1 | PJSC “Tulachermet”, Tula. | Construction of a bunker rack with conveyor for BF №1. |
2 | PRJSC “Balcem”, Balakliya. | Conversion of furnaces №1 and №2 to pulverized coal fuel. |
3 | PJSC «Azovstal Iron and Steel Works», Mariupol, Ukraine. | Reconstruction of the gas cleaning system of the converters of the converter shop. Unit. Afterburning candles. |
4 | Aktobe Ferroalloy Plant, Aktobe city. | System for localization, capture and removal of dust and gas emissions from DP No. 6 years, taking into account dust suppression with nitrogen |
5 | PJSC «NLMK», Lipetsk, Russian Federation. | System for localization, capture and removal of dust and gas emissions from BF №6 years, taking into account dust suppression with nitrogen. |
6 | PJSC «ArcelorMittal Kryvyi Rih». | Design of reconstruction of blast furnace №9 with a volume of 5000 m³ |
2020
№ | Facilities | Name of work |
---|---|---|
1 | Pulp mill «Sveza-Les» LLC, St. Petersburg | Effluent treatment and water intake facilities with a capacity of 100,000 m³ per day. |
2 | PJSC «DMKD», Kamenskoye, Ukraine. | Reconstruction of the BOF shop with modernization of the gas cleaning equipment for rotary kilns No. 1, No. 2. |
3 | PJSC «Azovstal Iron and Steel Works», Mariupol, Ukraine. | Reconstruction of blast furnace No. 6. Project. Cooling system, technological “dry type” gas cleaning plant, block of hot blast stoves, water supply and wastewater disposal. BIM model of the furnace complex. |
4 | PJSC «ArcelorMittal Krivyi Rih», Ukraine. | Wet type” dedusting plant in sinter shop No. 2. |
5 | PJSC «NLMK», Lipetsk, Russian Federation. | Investigation of the cast house aspiration systems of BF No4 and No. 6 with performing aerodynamic analysis. |
2019
№ | Facilities | Name of work |
---|---|---|
1 | PJSC «Ilyich Iron and Steel works», Mariupol, Ukraine | Cast house and stockhouse dedusting plants for BF №3 |
2 | PJSC «DMK», Kamenskoye, Ukraine | Sinter machine № 7 overhaul with modernization of the air supply to the sinter cooling area and installation of the sinter machine shelter. |
3 | PJSC «NLMK», Lipetsk, Russia | BF № 4. Cooling system and utility lines. |
4 | OJSC «Magnitogorsk Iron and Steel Works», Magnitogorsk, Russia | Dedusting system of BF №2 cast house |
5 | PJSC «Ilyich Iron and Steel works», Mariupol, Ukraine | Dedusting plants of BF № 2, 4 and 5 cast house and stockhouse |
6 | PJSC «SevGOK» Kryvyi Rih, Ukraine | Gas cleaning modernization of «Lurgy-552-A» burning machine (dedusting area). Pellet production shop №2. |
7 | PJSC «SevGOK» Kryvyi Rih, Ukraine | Cleaning rejects thickening |
8 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Reconstruction of BF№2. Main design solutions |
9 | PJSC «DMK», Kamenskoye, Ukraine | Design of steel pre-lined cooling staves for the BF №9 bosh and stack area with an automatic heat take off determination system |
2018
№ | Facilities | Name of work |
---|---|---|
1 | OJSC «Zaporizhstal», Zaporizhzhya, Ukraine | Project of modernization of BF№5 evaporative cooling system |
2 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Hydraulic and thermotechnical calculations of the tuyere cooling system with submitting recommendations on their lifetime increase |
3 | PJSC «DMKD», Kamenskoye, Ukraine | Design of steel pre-lined cooling staves for the BF №1M bosh and stack area with an automatic heat take off determination system |
4 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Changing of BF № 4 cooling to a closed loop system with replacement of the cooling staves |
5 | PJSC «NLMK», Lipetsk, Russia | A package of works on determination of reasons for premature tuyere stock failures at BF № 7 |
6 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Agglomeration shop № 2. Modernization of the process gas purification and air supply to the sinter cooling area of sinter machines № 7-12. Feasibility study. |
7 | PJSC «DMK», Kamenskoye, Ukraine | Co-generation plant with an electric power of 4000 kW and thermal power of 4288 kW |
8 | PJSC «DMKD», Kamenskoye, Ukraine | Automatic BF №1М and BF №9 cooling by means of chemically treated water with designing a combined pump house. |
2017
№ | Facilities | Name of work |
---|---|---|
1 | PJSC «EMZ», Yenakiyevo, Ukraine | Reconstruction of the BF emergency water supply system. Water supply shop. |
2 | «GOLDFISH CRAFT» LLC | Design and working documentation for a brewery with a production of 40 thousand decalitres / year. |
3 | «METINVEST-МRМZ» LCC, Mariupol, Ukraine | “Organization of the recovery water cooling system for electric arc steel-making furnaces in the Foundry №1” |
4 | OJSC «Zaporizhstal», Zaporizhzhya, Ukraine | Modernization of BF №2 and BF №4 evaporative cooling systems at PJSC “Zaporizhstal” using closed- loop chemically treated water for BF bosh, belly and stack staves cooling with installation of plate-type water-water heat exchangers. |
5 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Thermal and hydraulic design calculations of staves cooling of the 1st, 2nd bosh and stack rows at BF№1 with 140-180 kg/t PCI |
6 | ArcelorMittal Las Truchas Mexico | Installation of tilting troughs in the BF №1cast house |
7 | PJSC «NLMK», Lipetsk, Russia | Work package on the survey of BF №4, BF №5, BF №6 and BF №7 cooling systems |
8 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | 2nd category overhaul of BF №3 |
9 | PJSC «SevGOK» Kryvyi Rih, Ukraine | Gas cleaning modernization of «Lurgy-552-B» burning machine (dedusting area) Pellet production shop №2. |
10 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Feasibility study in the framework of the project “Overhaul of BF№ 6, PJSC“ MK Azovstal ” |
11 | OJSC «Magnitogorsk Iron and Steel Works», Magnitogorsk, Russia | Project of modernization of BF№5 evaporative cooling system |
2016
№ | Facilities | Name of work |
---|---|---|
1 | OJSC «Zaporizhstal», Zaporizhzhya, Ukraine | Detailed design documentation for the cooling system enhancement with modernization of the pump station and installation of 3 rows of copper cooling staves at BF №4. |
2 | OJSC «Zaporizhstal», Zaporizhzhya, Ukraine | Modernization of BF power supply system |
3 | OJSC «Magnitogorsk Iron and Steel Works», Magnitogorsk, Russia | BF №10 cast house dedusting system |
4 | PJSC «ArcelorMittal Kryvyi Rih», Kryvyi Rih, Ukraine | Main design solutions for construction of a new combined nitrogen and compressed air compressor station. |
5 | PJSC «ArcelorMittal Kryvyi Rih», Kryvyi Rih, Ukraine | Main design solutions for modernization of the existing «dirty» cycle of BF gas cleaning plant. |
6 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Reconstruction of the dedusting system of the breaker house of the bulk and ferroalloys stockyard, BOF shop |
7 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Nitrogen pressure stabilization system in the BOF shop for the Project “Construction of the first stage of the complex for PC preparation and injection into BF hearths, PJSC” MK “Azovstal” BF №4 “. |
8 | OJSC «ArcelorMittal Temirtau», Temirtau, Kazakhstan | Reconstruction of the common BFG header ᴓ3020. |
9 | PJSC «EMZ», Yenakiyevo, Ukraine | Reconstruction of the BF emergency water supply system. Water supply shop. |
2015
№ | Facilities | Name of work |
---|---|---|
1 | PJSC «Eurocement -Ukraine » Balakleya, Ukraine | Development of technical solutions for modernization of the gas cleaning plant, cement mill №10 |
2 | PJSC «ArcelorMittal Kryvyi Rih», Kryvyi Rih, Ukraine | Main design solutions for BF shop №2. Reconstruction of BF №9 |
3 | OJSC «Zaporizhstal», Zaporizhzhya, Ukraine | Development of design and working documentation for BF №3 cooling system. |
4 | PJSC «ArcelorMittal Kryvyi Rih», Kryvyi Rih, Ukraine | Design and working documentation for replacement of hot blast stove №2, BF №9. |
5 | PJSC «Ilyich Iron and Steel works», Mariupol, Ukraine | Design development for BF №4 complete overhaul of the 2-nd cathegory. |
6 | Aral district, Kyzylorda region, Republik of Kazakhstan | Heat power plant. Water treatment system. |
2014
№ | Facilities | Name of work |
---|---|---|
1 | OJSC «Zaporizhstal», Zaporizhzhya, Ukraine | Construction process supervision of BF №4 evaporative cooling system and industrial water staves cooling at OJSC «Zaporizhstal» |
2 | OJSC «Zaporizhstal», Zaporizhzhya, Ukraine | Cooling system detailed design for stack and bosh staves cooling of BF №2 at OJSC «Zaporizhstal» |
3 | PJSC «ArcelorMittal Kryvyi Rih», Kryvyi Rih, Ukraine | Supervision and issue of technical documentation during construction of BF №6 evaporative cooling system with forced circulation. |
4 | PJSC «МК «AZOVSTAL», Mariupol, Ukraine | Сomplete BF№4 overhaul of the 2-nd cathegory |
5 | OJSC «Poltava Iron ore refinery», Kremenchuk, Ukraine | The project for replacement of dry gas cleaning plant cyclones (with refractory lining) |
6 | OJSC «ArcelorMittal Temirtau», Temirtau, Kazakhstan | Сomplete BF №4 overhaul of the 2-nd cathegory. BF cooling system. Stockhouse modernization. BLT utilities. Hydraulic and grease piping. |